A multi-clinic group migrates 400 mailboxes with zero downtime
01The challenge
Eleven sites, 400 staff and a legacy mail platform at end of life. Clinics run appointment books, so the migration window was not “out of hours”, it was “between the last patient and the first one tomorrow”.
There was also no backup of the existing mail data at all, which nobody had realised until we asked.
02The approach
Assess, plan, migrate, optimise. We mapped every mailbox, shared calendar and clinical integration first, then migrated in eleven site-by-site waves, each with a rollback position.
Backup was stood up before anything moved, not after. Conditional access and enforced MFA went in as part of the migration rather than as a later project, because doing it twice costs more.
03The results
400 mailboxes migrated with zero downtime during clinic hours and no clinical session affected.
The group now runs a hardened tenant with backup, MFA and activity monitoring, and its licensing was reduced after the review found seats nobody was using.
By the numbers
The outcomes that mattered.
The service behind this
Cloud & Microsoft 365
More proof
Related case studies.
Start here
Want results like these?
A no-obligation conversation about your infrastructure, security posture and operational risk. No lock-in, and a response within one business day.